Operation and Maintenance

Search form

Operation and maintenance of the Don Pedro Recreation Area is mostly supported by facility use fees with some contributions from the sponsoring Agencies.
Hook-up campsites at the three developed camping areas offer electrical connections of 30 amps (120V power) and 20 amps (120V power).