|
|||||
Site Map | Employment | Directions |
|||||
| Home About Us Recreation Area Reservations Agency Business Links News & Events Contact Us | |||||
Don Pedro Lake Elevation |
Don Pedro Recreation Agency The Turlock and Modesto irrigation districts completed construction of the original Don Pedro Dam in 1923. With a storage capacity of 289,000 acre feet, it was barely able to accommodate the irrigation needs of a single growing season. After numerous dry winters, the Districts decided to replace the original dam with a much larger one in order to store water necessary to bridge multiple dry years. The City and County of San Francisco joined with the two irrigation districts in constructing what at the time was known as the New Don Pedro Project. The ‘New’ was formally dropped from its name after the old dam was inundated by the waters of the larger reservoir. Today, it is known simply as the Don Pedro Reservoir, Don Pedro Lake or Lake Don Pedro. In exchange for its financial contribution to the construction of the Project, San Francisco obtained relief from upstream flood control responsibility on the Tuolumne River and gained greater flexibility in its upstream operations. By virtue of a complex banking and accounting arrangement, San Francisco may pre-release water into Don Pedro where it becomes the property of the Districts. With a ‘credit’ in the Don Pedro water bank, San Francisco may then divert upstream flows to which the Districts would otherwise be entitled. This arrangement helps to conserve the waters of the Tuolumne and maximize their beneficial use. San Francisco does not own any portion of the Don Pedro Project or the water in the reservoir. It also does not physically divert any water from the reservoir into its water system.
Construction of the New Don Pedro Project began in 1967 and was completed four years later at a cost of $105 million. Built primarily to store irrigation water, the reservoir has a capacity of 2,030,000 acre-feet and has many additional benefits including power generation, flood control, and recreation. The old dam is still in place, 250 feet below the surface of the full reservoir. The Don Pedro Recreation Agency, which is responsible for the recreation element of the Don Pedro Project, is sponsored by the Turlock Irrigation District, the Modesto Irrigation District and the City and County of San Francisco. Dam statistics: • 580 Feet high
• 855 Feet above sea level at the crest
• 1900 Feet at crest length
• 40 Feet wide at crest
• 2800 Feet wide at its base
![]() Recreation More than 13 million people have visited Don Pedro Lake since 1971. With 160 miles of shoreline and nearly 13,000 acre-feet of surface area (at maximum lake level), visitors can enjoy boating, fishing, water sports, swimming and camping. One of the highlights of the year is the annual fireworks show over the lake celebrating the Fourth of July.
For more information, call the Don Pedro Recreation Area at (209) 852-2396.
|
||||